Yard & Truck Yard Signage Installation

ATA Technical Group installed 23 signs across the yard and truck yard areas at the DVC4 fulfillment center in Pitt Meadows, BC — covering safety rules, speed limits, and directional wayfinding to support safe, organized traffic flow throughout the facility’s yard operations.
Conveyor Support Netting Installation

ATA Technical Group installed 400 feet of support netting beneath active conveyor lines at the DVC4 fulfillment center in Pitt Meadows, BC — providing a safety and containment layer to catch delivery items before they could fall to the floor below.
Chain-Link Fencing Repair & Extension

ATA Technical Group was brought in to repair and extend 300 feet of interior chain-link fencing around the AR floor area at the YXX2 facility in Richmond, BC — reinforcing the security and safety boundaries of an active operational zone.
Parking Lot Safety Upgrade

ATA Technical Group was contracted to upgrade parking lot safety and infrastructure at the DVC4 fulfillment center in Pitt Meadows, BC — installing bollards, signage, and barricades across key traffic and pedestrian areas, along with energizing the LED indicator lighting associated with the site’s safety systems. This combined general contracting and electrical scope ensured both the physical infrastructure and its powered components were completed under one coordinated effort.
Conveyor Installation Support

ATA Technical Group was contracted to support the conveyor system installation at the YVR7 fulfillment center in Langley, BC — handling both the structural/mechanical assembly of the conveyor system and the electrical hookups required to bring it into operation. This combined scope allowed our team to manage two critical phases of the installation under one coordinated crew, reducing handoff delays between trades.
Concrete Joint Filling & 5S Tape

At the YXX2 facility in Richmond, BC, ATA Technical Group took on a large-scale floor maintenance scope — 3,000 linear feet of concrete joint filling and sealing, paired with 5S floor tape and signage installation across the facility’s key operational zones.